Everything you need to plan a playground
Costs, grants, compliance, procurement and planning, in one place. All of it free, none of it behind a form, and written to be useful whether or not you ever buy from us.
Start here
The four things every playground project turns on.
Guides
In depth, sourced, and written to be useful whether or not you buy from us.
How to buy a playground without going out to bid
Cooperative purchasing contracts let public agencies satisfy competitive procurement requirements without running an RFP. How they work, who can use them, and the months...
Playground inspection and maintenance: what actually has to happen
What a CPSI inspection covers, the checks your own staff should be doing weekly, and the maintenance failure that turns a compliant playground into...
How to plan a playground layout before you buy anything
Measure the use zone, not the structure. Work out peak capacity, not enrolment. The planning sequence that stops a project being redesigned after the...
ADA playground requirements, explained without the jargon
How many accessible components your playground needs, why the route matters more than the ramp, and the surfacing mistake that makes a technically compliant...
Engineered wood fiber: what it is and how not to get caught out
Engineered wood fiber is the most used playground surface in America and the most misunderstood. What it is, what it costs, how deep it...
Playground surfacing options compared: cost, compliance and upkeep
Engineered wood fibre, poured rubber, tiles, turf and sand, priced honestly and judged on the two things that actually matter: whether it stays compliant...
By who you are
The same project looks different depending on who signs it off.
Buying and procurement
How the paperwork actually runs.
Or just tell us about the project
You do not have to read any of it. Send the dimensions, the age ranges and a ZIP code and we will do the work and come back with one firm all-in number, normally inside 24 hours.
- One firm all-in price, not an equipment number you have to defend later
- Itemised the way a board paper or a grant application needs it
- Purchase orders, cooperative contracts and tax-exempt billing accepted